Welcome To b2b168.com, Join Free | Sign In
中文(简体) |
中文(繁體) |
Francés |Español |Deutsch |Pусский |
| No.13656295

- Product Categories
- Friendly Links
- home > Supply > Manufacturers of toilet water does not leak plugging gin does not leak plugging Ling wholesale
Information Name: | Manufacturers of toilet water does not leak plugging gin does not leak plugging Ling wholesale |
Published: | 2015-03-19 |
Validity: | 30 |
Specifications: | 20kg / box |
Quantity: | 999999.00 |
Price Description: | |
Detailed Product Description: | Water does not leak, plugging Ling Tel: 15866762218 I. Introduction This product is the absorption of foreign advanced technology development efficiency, moisture, permeability, sealing materials, are also excellent bonding material. The material was quick-setting type (mainly for impermeability plugging) retarding type (mainly for moisture seepage) are two-component are gray powder. Second, the product features a non-toxic, odorless, nonflammable can be used for drinking water projects. 2, setting hardening fast, quick-setting high early strength. 3, impermeability, sealing, micro-expansion, instant sealing. 4, Ying, dorsal surface construction can facilitate construction. 5, with the construction of water, moisture, permeability, rapid plugging. 6, the solidification time plugging an optional waterproof paste a complete strong bond, impermeability compression. 7, and the matrix are combined into a whole, not aging, good water resistance. Third, the scope can be used in a variety of masonry, concrete structure of the building or structure leak repair, especially for a variety of underground works with water plugging. In addition, retarding products (more than ten minutes at room temperature initial setting) is an ideal material for quick pasting tiles, mosaics, marble, water, paste can be completed. Fourth, the technical performance: in line with GB23440-2009 "waterproof plugging inorganic materials," the indicator. Fourth, the construction method (a) Construction Tools 1. Clean the base surface tools: shovels, chisels, hammers, wire brushes, brooms, rags 2. Weighing ingredients tools: a bucket, said mixing bucket (bowl), stir sticks 3 . plastering tools: scraper, trowel, indenter 4. plugging tool: different diameters stick 5. conservation tool: Bucket (pots), sprinkler, roller, brush (two), no construction of a seepage face The base surface must be sufficiently moist to saturated (but no water), and require a solid, clean, and smooth. Uneven at first with cement mortar or Extension of retarding plugging Coalinga 1-2 times in leveling sand. 2. Ingredients: no seepage surface construction should use retarding plugging Ling. The material according to powder: water = 1: 0.30 to 0.35 stir into uniform (excluding raw material powder or group) of putty-like. Spices by hand one should not more than 5 kg, otherwise use the blender spices. 3. material: the order "plastering work law" were feeding, two were doing. First with a trowel or squeegee first layer material: to be coated hardened after its Fen wet (but no water) and then a second layer of material. Intervals on each layer material is about 1 hour (time is too long, it will affect the adhesion between layers) when the material to be more multi-scraping back and forth several times to exert oneself, the coating dense, while paying attention to the lap. Each material about 1.2kg / square, the total material about 2.4kg / square, coating thickness of about 1.5mm. 4. moisture conservation. After the coating is hardened immediately moisture conservation, keep the coating damp to prevent chalking. The first conservation should be careful to avoid damaging the coating. A total of conservation 2-3 days, the way could be: water, cover the wet material, coating curing liquid. In particular, damp places (eg water in the basement, etc.) or after hardening waterproof coating, protective layer immediately above or paste made of blocks of material, eliminating the need for moisture conservation. (Three). 1. The base surface seepage surface construction requirements for wet processing, solid, clean, and smooth. Extension of injustice at the choice of plugging king plus 2 times the weight of the sand leveling base surface seepage serious diversion hole should be playing in place of the centralized water leakage leads. 2. Ingredients: serious leakage and seepage matrix should use Extension of quick-setting type plugging Ling, mixed (ratio based on the time required to carry out), press the powder powder: water = 1: 0.3 to 0.35 stir into uniform (not containing raw material powder or group) of putty-like. Ingredients not too much time to avoid solidification wastage. 3. material "by wiping the surface engineering methods" on the order of the material, a total of two to three times. Specifically: the base surface with a dry cloth to dry after the first layer of material with the trowel quickly, never mind if he leaks: After coating the surface of the first floor to dry hardening material: If there are more seepage and then in the same way the first three materials, if only a partial seepage, simply add a layer of water seepage at until no leakage. When the material to be a little harder to wipe back and forth a few times to make the coating more dense, while paying attention to the lap. Each material about 1.2kg / square, with a total quantity: two practice about 2.4kg / square, three practice about 3.6 kg / square, coating thickness: two practice about 1.5mm, about 2.2mm three practice . 4. moisture conservation methods with no seepage surface construction of Article 4. (Four) ,. plugging leaks port construction engineering methods: the proportion of ingredients: flour: water = 1: O.25 1: 0.3 ~ 0.35 Scope: plugging leaks mouth. Feeding: According to the shape of plugging the hole slightly smaller than the hole size, shape into dough, place for a while (to pinching hard feeling appropriate) after leaking into the mouth, and the backlog with a wooden stick, smashing it to the surrounding light Compaction. You can instantly stanch. Then a layer of about 10cm with a trowel scraping material around the outside of the hole, before plugging the hole around the leak site might want to do the best water treatment. And other coating having a hardness after plugging. Otherwise, water can seep from the surrounding. Wetland conservation: After coating harden immediately to prevent moisture conservation chalking, first conservation should be careful to avoid damaging the coating, curing methods can be: water, cover the wet material, coating curing liquid. In particular, damp place, or do bulk protective layer or pasted on the coating, eliminating the need for maintenance. After construction inspection and acceptance: After construction, should carefully check each part of the whole project, especially the weak link, found the problem and identify the reasons for timely repair, for wet environments, if there is no surface coating construction quality problems still water, moisture condensation should take into account that this phenomenon will disappear naturally after a dry spot. (Five), a protective layer and a protective layer construction decorative layer construction with decorative layer can be applied directly on the waterproof layer. Plus: (tiles, mosaics, marble, for example) Extension of time by plugging Ling water into a putty-like, can be directly used as adhesives, waterproof and paste once completed, for a fast-absorbent material pasted before pasting blocks of material need first of its soaking wet. VI, packaging storage 1. This product uses vacuum packaging, specifications: 5kg, a box of four bags, packaging cartons. 2. This product is easy to damp, damaged bags should be prevented, and should be stored in a dry place. 3, Xiaji Lie Kusakabe construction, humidification needs maintenance, construction following winter -5 ℃ need to add the weight of the powder accounted for 1-3% of sodium nitrite, rain construction, the need to prevent the rain washed out the waterproof layer. |
Admin>>>
You are the 7792 visitor
Copyright © GuangDong ICP No. 10089450, Jinan Extension of Building Materials Co., Ltd. All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility
You are the 7792 visitor
Copyright © GuangDong ICP No. 10089450, Jinan Extension of Building Materials Co., Ltd. All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility